जवाहर नवोदय विद्यालय गदग
Jawahar Navodaya Vidyalaya Gadag
(An Autonomous body under MHRD) Government of India
Infrastructure
I
|
Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
|
: 31.19 acres
: Yes
: Yes
|
||
ii
|
Status of Boundary Wall
a. Brick Wall
b. Barbed wire fencing
|
: Completed
Stone wall & height increased by barbed wire
|
||
iii
|
Permanent buildings constructed
|
: CPWD pattern
|
||
iv
|
School building
|
: Complete
|
||
v
|
Dormitories
|
: Boys 02 Nos.
with Warden Residence 08 Nos.
|
||
|
|
: Girls 01 Nos.
with Warden Residence 04 Nos.
|
||
vi
|
Kitchen/dining Hall
No. of shifts required for all students to take food
|
: Complete
One
|
||
vii
|
Principal Residence
|
: 01 No.
|
||
viii
|
Staff Quarters
|
: Type III = 20 Nos.
Type II = 06 Nos.
Type I = 06 Nos.
SP Sheds converted into Staff Qrs.: NA
|
||
ix
|
M.P. Hall
|
: Not available
|
||
x
|
Workshop
|
: Not available
|
||
xi
|
Type of O.H. Tank
Its capacity
Present Status
|
: Shaft type / Column based
: 1 lakh litres
: Working satisfactory
|
||
xii
|
U.G. tank
Its capacity
Present Status
|
: 1 lakh litres
: Working satisfactory
|
||
xiii
|
D.G. Set
|
: Available
: ____________ make
: ______ KV
: Working
: Year of procurement
|
||
xiv
|
Sewage Pump
|
: ______ H.P.
|
||
xv
|
Water Pump
|
: 04 H.P. Capacity
|
||
xvi
|
Electrification
Electric connection
Sub Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average.
|
: Urban Feeder
: Complete
: 44 Nos. of Poles
: Full day
|
||
xvii
|
Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
|
: Available
: 2 Nos. – Available
: 4 Nos. – Available
|
||
xviii
|
Water supply
Tube Well
Hand pump
Connection from PHED
|
: Potable, 04 Nos.- working
: Potable, 03 Nos.- working
: 03 hours supply in a day
|
||
xix
|
Rajiv Gandhi Smriti Van
|
: Not available
|
||
xx
|
Fire fighting arrangement
|
: Working
|
||
xxi
|
Last date of cleaning of
(a) Septic tank
(b) Water tanks
|
: --
: 31-05-2008
|
||
xxii
|
Whether area around transformer is fenced
|
: Yes
|
||
xxiii
|
Whether open wells, if any, are covered from top
|
: NA
|
||
xxiv
|
Works taken up under M&R fund during current year and last year:-
|
:
Bath room doors repaired
|
||
Year
|
Name of work (M&R)
|
Expenditure
(Rs. In lacs)
|
Cumulative expenditure during the year
|
|
2007-08
|
Bath room doors repaired
|
1.00 lac
|
1.00 Lac
|